Mon-Fri: 8am - 6pm, Sat: 9am - 4pm, Sun: Closed
🌊 Stop replacing timber. Start building to last.

🌊 Stop replacing timber. Start building to last.

Last month, I watched a contractor tear down a 5-year-old pier in the Caribbean. Cost to replace? $2.3 million. The reason? Standard timber couldn’t handle the marine environment.

Here’s what most procurement managers don’t know: Greenheart timber has been protecting marine structures for over 200 years.

With a density of 970 kg/m³ and natural resistance to marine borers, it’s the timber that turns temporary fixes into permanent solutions.

Why Greenheart outperforms everything else:

✅ Natural decay resistance – No chemical treatments needed

✅ Marine borer immunity – Saltwater can’t touch it

✅ Weather-proof durability – Caribbean storms don’t stand a chance ✅ Cost-effective longevity – Higher upfront cost, 10x longer lifespan

The London Docklands still uses Greenheart piles installed in the 1800s. That’s not a story – that’s proof.

What challenges are you facing with marine timber in your current projects?

Have you experienced premature timber failure that could have been avoided?

Ready to build structures that last generations, not just years? Visit goldenarrowtimber.com or connect with me directly to discuss your next project.

#MarineConstruction #SustainableTimber #ProcurementExcellence #GreenhearTimber #ConstructionMaterials #MarineEngineering #SustainableProcurement #BuildingToLast