Mon-Fri: 8am - 6pm, Sat: 9am - 4pm, Sun: Closed
Stop replacing timber. Start building to last.

Stop replacing timber. Start building to last.

Last month, I watched a contractor tear down a 5-year-old pier in the Caribbean. Cost to replace? $2.3 million. The reason? Standard timber couldn’t handle the marine environment.

Here’s what most procurement managers don’t know: Greenheart timber has been protecting marine structures for over 200 years.

With a density of 970 kg/m³ and natural resistance to marine borers, it’s the timber that turns temporary fixes into permanent solutions.

Why Greenheart outperforms everything else:

✅ Natural decay resistance – No chemical treatments needed

✅ Marine borer immunity – Saltwater can’t touch it

✅ Weather-proof durability – Caribbean storms don’t stand a chance ✅ Cost-effective longevity – Higher upfront cost, 10x longer lifespan

The London Docklands still uses Greenheart piles installed in the 1800s. That’s not a story – that’s proof.

What challenges are you facing with marine timber in your current projects?

Have you experienced premature timber failure that could have been avoided?